Difference between revisions of "Portal:MERMAID/Atlantic Ocean"

From Coastal Wiki
Jump to: navigation, search
Line 1: Line 1:
 
There are two test sites proposed for the project: Ubiarco and Santoña. Both test sites are located in Spain, off-shore the region of Cantabria.
 
There are two test sites proposed for the project: Ubiarco and Santoña. Both test sites are located in Spain, off-shore the region of Cantabria.
 +
 +
<div style="float:right; margin-left:10px; width:170px; font-size: 90%; text-align:right">
 +
[[File:Idermarmeteofloatingmetmast..jpg|170px]]<br/>
 +
A meteorological mast located 5 km offshore, will assess wind conditions
 +
</div>
  
 
The Ubiarco test site is expected to be operational by the end of 2012. It will be able to manage three floating wind turbines and three wave energy concepts. They will be deployed reducing interaction and wake effects between them. Weather will be assessed thanks to a meteorological mast, which have been already deployed (June 2010) thanks to the R&D Company IDERMAR.
 
The Ubiarco test site is expected to be operational by the end of 2012. It will be able to manage three floating wind turbines and three wave energy concepts. They will be deployed reducing interaction and wake effects between them. Weather will be assessed thanks to a meteorological mast, which have been already deployed (June 2010) thanks to the R&D Company IDERMAR.

Revision as of 15:08, 10 April 2013

There are two test sites proposed for the project: Ubiarco and Santoña. Both test sites are located in Spain, off-shore the region of Cantabria.

Idermarmeteofloatingmetmast..jpg
A meteorological mast located 5 km offshore, will assess wind conditions

The Ubiarco test site is expected to be operational by the end of 2012. It will be able to manage three floating wind turbines and three wave energy concepts. They will be deployed reducing interaction and wake effects between them. Weather will be assessed thanks to a meteorological mast, which have been already deployed (June 2010) thanks to the R&D Company IDERMAR.

Santoña test site will be a small site devoted to wave energy devices and will also be connected to the grid. The electrical connection will be based on an onshore electrical substation, submerged power cables and a submerged pod all of them already available and ready for deployment.

Both sites will be fully monitored thanks to existing operational systems for wind, waves and currents. The floating platforms open up the opportunity of installing wind farms in deep waters because they do not need anchorage, something especially important in Spain, where the continental shelf is narrow.